Subcontractor Scope Letter Generator

AI writes scope of work letters from plans and specs

Unclear Scope Letters Cause $50K+ Change Orders

GCs spend 6-10 hours per project writing scope letters for 8-15 subcontractors, often missing details that lead to change orders. Subcontractors bid based on incomplete scope, discovering missing work during construction. Scope gaps cause delays and finger-pointing. Change orders average $50K-200K per project due to unclear scope definitions.

6-10 hrs
Time writing scope letters
70%
Projects with scope disputes
$50-200K
Change orders from scope gaps

Crystal-Clear Scope Letters in Minutes

AI system that reads construction documents, extracts trade-specific work, generates detailed scope letters including inclusions/exclusions, references plan sheets and spec sections, and produces subcontractor-ready documents--reducing 8 hours to 30 minutes and eliminating scope disputes.

Upload full construction document set (plans, specs, addenda)

AI identifies work for each trade: electrical, plumbing, HVAC, framing, etc.

Generates scope letter with: inclusions, exclusions, plan references, spec sections

Lists quantities and locations for major scope items

Includes standard GC requirements: warranties, insurance, schedule

Exports to Word for customization and subcontractor distribution

From Plans to Scope Letters

1

Upload Documents

Drop blueprint set and spec book PDFs. System processes architectural, MEP, structural drawings.

2

Extract Trade Scopes

Claude Vision reads plans and identifies work by trade. Cross-references spec divisions.

3

Generate Letters

AI writes scope letter for each trade with inclusions, exclusions, plan sheet references, quantities.

4

Review & Send

PM reviews AI-generated scopes, makes adjustments, exports to Word and sends to subs for bidding.

Key Features

Spec Cross-Reference

Links plan items to spec sections automatically. "Electrical outlets per Div 26 Section 26 27 13."

Exclusions Library

Suggests common exclusions by trade. "Electrical excludes: data/low voltage, generator, fire alarm."

Addenda Integration

Reads addenda and updates scope letters with changes. Never miss an addendum update.

Quantity Takeoff

Provides high-level quantities for major items. "Approx 1,200 SF of ceramic tile (see plans for exact)."

Scope Letter Stack

Claude 3.5 Vision
PDF/blueprint parsing
Spec division database
Quantity estimation
Word document generation
Version control

Who Benefits?

General Contractors

Eliminate scope gap change orders. Get apples-to-apples bids from subcontractors with clear scope.

Construction Managers

Provide owners with detailed trade breakdown during budget development. Avoid surprises.

Design-Build Firms

Generate scope letters during design phase for early trade contractor input and pricing.